| Fill Placement in Cutoff Trench For Dam | Placement of Rock Riprap on Upstream Face of Zreet Street | Fill Placement near Intake Tower | Installation of 48-Inch Outlet Pipe for Dam |
 |  |  |  |
| Relocation of Oncor Transmission and Distribution Lines | Placement of Backfill around 48-Inch Outlet Pipe | Placement of Fill in Cutoff Trench for Dam | Construction of the Spillway Stilling Basin |
 |  |  |  |
Construction of the Spillway Stilling Basin | Installation of 48-Inch Outlet Pipe Thru Dam | Placement of Sand Filter Drain and Backfill along 48-Inch Outlet Pipe | Construction of Spillway Apron and Stilling Basin |
 |  |  |  |
Construction of Spillway Apron and Stilling Basin | Steel Reinforcement for Spillway Side Walls and Impact Blocks | Rock Riprap on Upstream (West) Face of Zreet Street | Fill Placement Within Cutoff Trench for Dam |
 |  | | |
| Installation of 30-In Gate Valve for Outlet to Stilling Basin | Construction of Spillway Chute and Stilling Basin | | |