| Contract 3: Raw Water Pipeline Contract No. 3 includes the construction of a 15.5-mile, 30-inch diameter pipeline from the Colorado River Intake & Pump Station (Contract 4) to the Raw Water Storage Reservoir (Contract 2). The pipeline route will extend from the river intake and pump station, about 2 miles downstream of Longhorn Dam, through East Austin and eastern Travis County to Pflugerville. The pipeline will cross 16 public roads and 9 major streams. Contract No. 3 was awarded to S.J. Louis Construction of Texas, Ltd. on April 27, 2004 for the amount of $8,085,940.60. The schedule for completion is 365 days from the date of Notice to Proceed. Pipeline Route (.pdf, 11x17, 1.6 MB) Pipeline Route |