Contract 3:
  Raw Water Pipeline

Contract No. 3 includes the construction of a 15.5-mile, 30-inch diameter pipeline from the Colorado River Intake & Pump Station (Contract 4) to the Raw Water Storage Reservoir (Contract 2).  Contract No. 3 is scheduled for advertisement for bids in March 2004.  The pipeline route will extend from the river intake and pump station, about 2 miles downstream of Longhorn Dam, through East Austin and eastern Travis County to Pflugerville.  The pipeline will cross 16 public roads and 9 major streams.  The total estimated cost for Contract No. 3 is $8,900,000.

Pipeline Route (.pdf, 11x17, 1.6 MB)

Pipeline Route

 

 
 

 

HDR, Inc.     512.912.5100
Copyright 2004 HDR, Inc. All rights reserved.
Last Updated 02/26/2004

| | | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | City of Pflugerville,Colo | PSP WALLPAPERS, FREE PSPArraywarsaw hotelsArraypfizerArrayKontrahent Biznes PartnerArrayTramadol Online