| Contract 5: Water Treatment Plant Contract No. 5 includes the construction of a 12 mgd membrane water treatment plant, raw water pump station, ground storage tank, and high service pump station. The membrane water treatment equipment was procured by the City in June 2003 and was awarded to Zenon Environmental. Contract No. 5 includes assignment of the membrane equipment contract to the contractor and construction of the water treatment plant facilities including the buildings, piping, equipment, and instrumentation. Contract No. 5 has been advertised for bids. Bids are scheduled to be opened on March 2, 2004. The estimated cost for Contract No. 5 is $12,900,000. |